Hallberg Rassy Rasmus 35

Hallberg Rassy Rasmus 35
An Old Classic

Tuesday, October 11, 2011

Rasmus Progress: New Anchor Setup, New Head, and Closet

This past week I have been working on the anchor platform setup, the head, and the closet.  I have nearly completed all of these task with pictures below. 


 

The beefed up anchor platform base.  Two inch teak
bonded to hull with 3/8 inch bronze bolts to hold it in place.

Here is a peek at the new head.
 \
The new head with a Natures Head composting toilet.

The remodeled closet.
I had to build three new shelves for under the head sink.

2 comments:

Windtraveler said...

Wow!! You do such incredible work Pat - looks incredible!!!

Cabatach said...

Pat

I have legs for my boat. Never used them, my mooring is in 18m of water, but the boat came from Liverpool and its much shallower down there. Anyway, the legs come up and over the hull and connect to lugs on the side deck via a single bolt orientated fore and aft . It appears to work well as the leg allows some movement away from the hull and the bolt is less stressed in that plane. They are made from three length of box section to allow dis-assembly and the whole lot fits under the front bunk.